

Yesterday (25/2/25) Andy and Ian came to site with a digger and dumper truck to remove the tree stump and excavate the ground ready for the concrete slab. Lakers provided the hardcore and that was packed in level. The next job is to build the shuttering for the concrete.
Leave a Reply